Turn-key Project Introduction


Slaughterhouse Turn-key project process as follows:

  1. Preliminary scheme

  2. Land selection

  3. Solution construction discussion

  4. Design craft process

  5. Final confirmation

  6. Architecture design

  7. Architecture execution

  8. Get into production

  9. Complete main body

  10. Equipment installment

  11. Factory decoration

  12. Water&electricity connection

  13.  Final acceptance


Equipment include:
Slaughtering equipment, Cutting equipment, Refrigeratory equipment,Air conditioning equipment,Cold storage insulation and cold storage doors,Ventilation equipment,Water supply equipment, Sewage treatment equipment, Stainless steel equipment, Hot water supply equipment, Video monitoring equipment, Quality tracing equipment